Every active risk above the watch threshold gets a ranked, costed action — not just a prediction. Ranked by expected avoided loss.

Total interventions
12
Expected avoided loss
€791k
Total intervention cost
€4k
Blended ROI
222×

Investigate the smoke particulate reading immediately and confirm no active combustion.

Residential Tower London · Fire · act within 5h
Risk reduction
81 → 61
Avoided loss
€161k
ROI
460.5×

Investigate the smoke particulate reading immediately and confirm no active combustion.

Riverside Office Park Singapore 4 · Fire · act within 2h
Risk reduction
89 → 78
Avoided loss
€134k
ROI
382.5×

Investigate the smoke particulate reading immediately and confirm no active combustion.

Flagship Store Chicago · Fire · act within 1h
Risk reduction
91 → 75
Avoided loss
€131k
ROI
372.9×

Investigate the smoke particulate reading immediately and confirm no active combustion.

Apartment Complex Toulouse · Fire · act within 4h
Risk reduction
84 → 72
Avoided loss
€74k
ROI
212.2×

Investigate the smoke particulate reading immediately and confirm no active combustion.

Flagship Store Leeds 8 · Fire · act within 8h
Risk reduction
52 → 42
Avoided loss
€64k
ROI
183×

Investigate the smoke particulate reading immediately and confirm no active combustion.

Meridian Tower Berlin · Fire · act within 8h
Risk reduction
52 → 43
Avoided loss
€56k
ROI
161.2×

Investigate the smoke particulate reading immediately and confirm no active combustion.

Data Campus Singapore 5 · Fire · act within 8h
Risk reduction
61 → 52
Avoided loss
€53k
ROI
150.7×

Inspect the main line for a developing fault before pressure loss becomes a burst.

Housing Estate Munich · Water damage · act within 6h
Risk reduction
78 → 69
Avoided loss
€34k
ROI
129.5×

Physically inspect the flagged pipe zone for leaks, corrosion or fittings under stress.

Outlet Center Hamburg 3 · Water damage · act within 6h
Risk reduction
87 → 77
Avoided loss
€29k
ROI
159.5×

Enable pipe heating/trace tape and confirm heating system is holding setpoint.

Data Campus Hamburg 7 · Water damage · act within 8h
Risk reduction
60 → 51
Avoided loss
€23k
ROI
152.4×

Schedule an inspection of the flagged equipment before the next duty cycle.

Flagship Store Paris · Equipment breakdown · act within 7h
Risk reduction
76 → 66
Avoided loss
€20k
ROI
65.8×

Confirm the flagged door/access point and repair the sensor or lock mechanism.

Colocation Facility Paris · Theft / intrusion · act within 8h
Risk reduction
61 → 54
Avoided loss
€13k
ROI
60.1×