SafeGuard
← All assets

Riverside Office Park Singapore 4

Office · Singapore, Singapore · built 1956

Insured value
€11.5M
Occupancy
54%
Sensor coverage
62%
Maintenance
90d overdue
Fire — why this score
updated 2h ago

Critical fire risk developing at Riverside Office Park Singapore 4. Elevated particulate detected; +17% above baseline. Estimated probability within 24h: 48%. SafeGuard estimates a likely window of the next 5 hours if conditions persist.

Probability 24h
48%
Probability 7d
86%
Probability 30d
95%
Risk velocity
+12.8 pts/h
Confidence
75%
Preventability
82%
Predicted score in 24h

Trailing 24h sensor trend, projected forward and re-scored — not the current snapshot repeated.

90↑Critical

Trigger for Fire: Watch ≥25 · Elevated ≥50 · Critical ≥75 · change trigger

Contributing factors
Smoke particulate16
elevated particulate detected
Electrical temperature13
+17% above baseline
Power draw anomaly12
+35% surge
Maintenance overdue9
90 days overdue
Live sensor readings
temperature
20.53 °C
baseline 21°C
humidity
40.59 %
baseline 45%
water Flow
8.93 L/min
baseline 3L/min
water Pressure
4.48 bar
baseline 4.2bar
smoke
10.08 µg/m³
baseline 4µg/m³
electrical Load
94.63 %
baseline 60%
electrical Temp
58.14 °C
baseline 37°C
vibration
3.31 mm/s
baseline 2.1mm/s
door State
0.61 events
baseline 0.4events
motion
3.66 events
baseline 0.8events
seismic Activity
0.02 g
baseline 0.015g
co2
428.53 ppm
baseline 449ppm
decibel
64.08 dB
baseline 38dB
17.6°C · 1.1mm/24h · wind 28km/h
Derived signals
Estimated occupancy: ~0 people (interpreted from CO₂ at 428.53ppm)
Structural trend: stable, no sustained drift
Drone / aerial roof inspection

Upload a drone or aerial photo — SafeGuard analyzes it for damage and feeds the result into water-damage risk.

Analysis runs on real pixel data (staining, tone variance, edge discontinuities, corrosion hue) — not a placeholder score.

Recommended interventions
Dispatch fire safety inspection

Investigate the smoke particulate reading immediately and confirm no active combustion.

Cost €350Avoided €134kROI 382.5×
Claims & incident history
Water damagePREVENTED

Water heater failure flooded a plant room at Riverside Office Park Singapore 4. Caught by SafeGuard before loss occurred — figures below are the estimated avoided loss.

6 months ago · root cause: End-of-life appliance
€25k
Flood

Storm surge caused ground-floor flooding at Riverside Office Park Singapore 4.

12 months ago · root cause: Coastal/storm exposure
€490k
Earthquake

Seismic activity caused structural damage at Riverside Office Park Singapore 4.

15 months ago · root cause: Ground motion exceeding structural tolerance
€816k
Water damage

Water heater failure flooded a plant room at Riverside Office Park Singapore 4.

15 months ago · root cause: End-of-life appliance
€36k
Flood

Storm surge caused ground-floor flooding at Riverside Office Park Singapore 4.

28 months ago · root cause: Coastal/storm exposure
€646k
Equipment breakdown

Critical motor failure halted operations at Riverside Office Park Singapore 4.

33 months ago · root cause: Bearing wear beyond service interval
€158k