SafeGuard
← All assets

Data Campus Singapore 5

Data center · Singapore, Singapore · built 1961

Insured value
€5.45M
Occupancy
83%
Sensor coverage
57%
Maintenance
82d overdue
Fire — why this score
updated 2h ago

Fire risk elevated at Data Campus Singapore 5. Elevated particulate detected; +15% above baseline. Estimated probability within 24h: 18%. SafeGuard estimates a likely window of the next 39 hours if conditions persist.

Probability 24h
18%
Probability 7d
46%
Probability 30d
55%
Risk velocity
+8 pts/h
Confidence
72%
Preventability
82%
Predicted score in 24h

Trailing 24h sensor trend, projected forward and re-scored — not the current snapshot repeated.

62↑Elevated

Trigger for Fire: Watch ≥25 · Elevated ≥50 · Critical ≥75 · change trigger

Contributing factors
Smoke particulate20
elevated particulate detected
Electrical temperature16
+15% above baseline
Power draw anomaly11
+18% surge
Maintenance overdue9
82 days overdue
Live sensor readings
temperature
25.95 °C
baseline 21°C
humidity
39.95 %
baseline 45%
water Flow
9.96 L/min
baseline 3L/min
water Pressure
4.2 bar
baseline 4.2bar
smoke
9.75 µg/m³
baseline 4µg/m³
electrical Load
78.03 %
baseline 60%
electrical Temp
55.78 °C
baseline 37°C
vibration
1.88 mm/s
baseline 2.1mm/s
door State
2.02 events
baseline 0.4events
motion
0 events
baseline 0.8events
seismic Activity
0.02 g
baseline 0.015g
co2
596.18 ppm
baseline 475ppm
decibel
36.04 dB
baseline 38dB
20.2°C · 9.8mm/24h · wind 15km/h
Derived signals
Estimated occupancy: ~5 people (interpreted from CO₂ at 596.18ppm)
Structural trend: stable, no sustained drift
Drone / aerial roof inspection

Upload a drone or aerial photo — SafeGuard analyzes it for damage and feeds the result into water-damage risk.

Analysis runs on real pixel data (staining, tone variance, edge discontinuities, corrosion hue) — not a placeholder score.

Recommended interventions
Dispatch fire safety inspection

Investigate the smoke particulate reading immediately and confirm no active combustion.

Cost €350Avoided €53kROI 150.7×
Claims & incident history
Water damage

Water heater failure flooded a plant room at Data Campus Singapore 5.

17 months ago · root cause: End-of-life appliance
€9k
Water damage

Pipe burst overnight in a service riser at Data Campus Singapore 5 after freezing temperatures.

21 months ago · root cause: Uninsulated pipework, freeze event
€38k
Theft / intrusion

Break-in through a rear access point at Data Campus Singapore 5.

22 months ago · root cause: Access control gap, no after-hours monitoring
€125k
Water damage

Pipe burst overnight in a service riser at Data Campus Singapore 5 after freezing temperatures.

34 months ago · root cause: Uninsulated pipework, freeze event
€33k