SafeGuard
← All assets

Meridian Tower Marseille 7

Office · Marseille, France · built 1984

Insured value
€9.64M
Occupancy
41%
Sensor coverage
58%
Maintenance
32d overdue
Fire — why this score
updated 2h ago

Fire risk building at Meridian Tower Marseille 7. Elevated particulate detected; +14% above baseline. Estimated probability within 24h: 3%.

Probability 24h
3%
Probability 7d
7%
Probability 30d
18%
Risk velocity
+2.5 pts/h
Confidence
73%
Preventability
82%
Predicted score in 24h

Trailing 24h sensor trend, projected forward and re-scored — not the current snapshot repeated.

32↑Watch

Trigger for Fire: Watch ≥25 · Elevated ≥50 · Critical ≥75 · change trigger

Contributing factors
Smoke particulate37
elevated particulate detected
Electrical temperature23
+14% above baseline
Power draw anomaly2
stable load
Live sensor readings
temperature
26.19 °C
baseline 21°C
humidity
47.13 %
baseline 45%
water Flow
3.31 L/min
baseline 3L/min
water Pressure
4.46 bar
baseline 4.2bar
smoke
11.22 µg/m³
baseline 4µg/m³
electrical Load
52.68 %
baseline 60%
electrical Temp
54.98 °C
baseline 37°C
vibration
3.6 mm/s
baseline 2.1mm/s
door State
0 events
baseline 0.4events
motion
0.61 events
baseline 0.8events
seismic Activity
0 g
baseline 0.015g
co2
416.93 ppm
baseline 437ppm
decibel
41.74 dB
baseline 38dB
9.6°C · 59.3mm/24h · wind 70km/h
Derived signals
Estimated occupancy: ~0 people (interpreted from CO₂ at 416.93ppm)
Structural trend: stable, no sustained drift
Drone / aerial roof inspection

Upload a drone or aerial photo — SafeGuard analyzes it for damage and feeds the result into water-damage risk.

Analysis runs on real pixel data (staining, tone variance, edge discontinuities, corrosion hue) — not a placeholder score.

Claims & incident history
Water damage

Pipe burst overnight in a service riser at Meridian Tower Marseille 7 after freezing temperatures.

60d ago · root cause: Uninsulated pipework, freeze event
€40k
Flood

Storm surge caused ground-floor flooding at Meridian Tower Marseille 7.

19 months ago · root cause: Coastal/storm exposure
€165k
Equipment breakdown

HVAC compressor failure at Meridian Tower Marseille 7 caused a partial shutdown.

23 months ago · root cause: Overdue service interval
€107k