SafeGuard
← All assets

Summit Business Center Singapore

Office · Singapore, Singapore · built 2022

Insured value
€6.65M
Occupancy
57%
Sensor coverage
79%
Maintenance
10d overdue
Flood — why this score
updated 2h ago

Flood risk at Summit Business Center Singapore is within its normal range. No active precursor signals.

Probability 24h
0%
Probability 7d
0%
Probability 30d
3%
Risk velocity
0 pts/h
Confidence
84%
Preventability
38%
Predicted score in 24h

Trailing 24h sensor trend, projected forward and re-scored — not the current snapshot repeated.

21→Normal

Trigger for Flood: Watch ≥25 · Elevated ≥50 · Critical ≥75 · change trigger

Contributing factors
Flood map zone100
mapped as high exposure zone
24h precipitation2
8.7mm in the last 24h
Wind / surge proxy2
20 km/h sustained
Live sensor readings
temperature
22.6 °C
baseline 21°C
humidity
36.33 %
baseline 45%
water Flow
2.39 L/min
baseline 3L/min
water Pressure
4.32 bar
baseline 4.2bar
smoke
5.75 µg/m³
baseline 4µg/m³
electrical Load
62.43 %
baseline 60%
electrical Temp
34.05 °C
baseline 37°C
vibration
2.29 mm/s
baseline 2.1mm/s
door State
0.13 events
baseline 0.4events
motion
0.16 events
baseline 0.8events
seismic Activity
0.03 g
baseline 0.015g
co2
493.99 ppm
baseline 451ppm
decibel
34.3 dB
baseline 38dB
21.9°C · 8.7mm/24h · wind 20km/h
Derived signals
Estimated occupancy: ~2 people (interpreted from CO₂ at 493.99ppm)
Structural trend: stable, no sustained drift
Drone / aerial roof inspection

Upload a drone or aerial photo — SafeGuard analyzes it for damage and feeds the result into water-damage risk.

Analysis runs on real pixel data (staining, tone variance, edge discontinuities, corrosion hue) — not a placeholder score.

Claims & incident history
Earthquake

Seismic activity caused structural damage at Summit Business Center Singapore.

60d ago · root cause: Ground motion exceeding structural tolerance
€801k
Flood

Storm surge caused ground-floor flooding at Summit Business Center Singapore.

8 months ago · root cause: Coastal/storm exposure
€285k
Earthquake

Seismic activity caused structural damage at Summit Business Center Singapore.

29 months ago · root cause: Ground motion exceeding structural tolerance
€501k