Data Campus Munich 4

Data center · Munich, Germany · built 2011

Insured value
€4.29M
Occupancy
60%
Sensor coverage
71%
Maintenance
48d overdue
Flood — why this score
updated 2h ago

Flood risk at Data Campus Munich 4 is within its normal range. No active precursor signals.

Probability 24h
0%
Probability 7d
0%
Probability 30d
4%
Risk velocity
0 pts/h
Confidence
80%
Preventability
38%
Predicted score in 24h

Trailing 24h sensor trend, projected forward and re-scored — not the current snapshot repeated.

21→Normal

Trigger for Flood: Watch ≥25 · Elevated ≥50 · Critical ≥75 · change trigger

Contributing factors
Active storm warning41
regional storm warning in effect
24h precipitation30
47mm in the last 24h
Wind / surge proxy10
46 km/h sustained
Flood map zone2
mapped as low exposure zone
Live sensor readings
temperature
21.09 °C
baseline 21°C
humidity
63.53 %
baseline 45%
water Flow
3.29 L/min
baseline 3L/min
water Pressure
4.03 bar
baseline 4.2bar
smoke
5.76 µg/m³
baseline 4µg/m³
electrical Load
68.45 %
baseline 60%
electrical Temp
32.46 °C
baseline 37°C
vibration
2.25 mm/s
baseline 2.1mm/s
door State
0.4 events
baseline 0.4events
motion
1.38 events
baseline 0.8events
seismic Activity
0.02 g
baseline 0.015g
co2
435.76 ppm
baseline 454ppm
decibel
35.99 dB
baseline 38dB
-1.2°C · 47mm/24h · wind 46km/h· storm warning· freeze active
Derived signals
Estimated occupancy: ~0 people (interpreted from CO₂ at 435.76ppm)
Structural trend: stable, no sustained drift
Drone / aerial roof inspection

Upload a drone or aerial photo — SafeGuard analyzes it for damage and feeds the result into water-damage risk.

Analysis runs on real pixel data (staining, tone variance, edge discontinuities, corrosion hue) — not a placeholder score.

Claims & incident history
Theft / intrusion

Break-in through a rear access point at Data Campus Munich 4.

5 months ago · root cause: Access control gap, no after-hours monitoring
€53k
Fire

Electrical fault ignited a small fire in the switchgear room at Data Campus Munich 4.

17 months ago · root cause: Overloaded circuit, deferred maintenance
€336k
Earthquake

Seismic activity caused structural damage at Data Campus Munich 4.

18 months ago · root cause: Ground motion exceeding structural tolerance
€801k