SafeGuard
← All assets

High Street Store Marseille

Retail · Marseille, France · built 1974

Insured value
€8.87M
Occupancy
69%
Sensor coverage
43%
Maintenance
117d overdue
Fire — why this score
updated 2h ago

Fire risk building at High Street Store Marseille. Elevated particulate detected; +24% surge. Estimated probability within 24h: 5%.

Probability 24h
5%
Probability 7d
12%
Probability 30d
32%
Risk velocity
+1.5 pts/h
Confidence
65%
Preventability
82%
Predicted score in 24h

Trailing 24h sensor trend, projected forward and re-scored — not the current snapshot repeated.

88↑Critical

Trigger for Fire: Watch ≥25 · Elevated ≥50 · Critical ≥75 · change trigger

Contributing factors
Smoke particulate41
elevated particulate detected
Power draw anomaly16
+24% surge
Maintenance overdue10
117 days overdue
Electrical temperature2
within normal range
Live sensor readings
temperature
20.9 °C
baseline 21°C
humidity
44.48 %
baseline 45%
water Flow
1.17 L/min
baseline 3L/min
water Pressure
4.39 bar
baseline 4.2bar
smoke
12.41 µg/m³
baseline 4µg/m³
electrical Load
83.96 %
baseline 60%
electrical Temp
34.23 °C
baseline 37°C
vibration
3.82 mm/s
baseline 2.1mm/s
door State
0.53 events
baseline 0.4events
motion
3.03 events
baseline 0.8events
seismic Activity
0.03 g
baseline 0.015g
co2
481.62 ppm
baseline 462ppm
decibel
41.62 dB
baseline 38dB
3.2°C · 3.4mm/24h · wind 22km/h
Derived signals
Estimated occupancy: ~2 people (interpreted from CO₂ at 481.62ppm)
Structural trend: drifting upward (+0.026 g/day sustained over 24h) — possible developing crack
Drone / aerial roof inspection

Upload a drone or aerial photo — SafeGuard analyzes it for damage and feeds the result into water-damage risk.

Analysis runs on real pixel data (staining, tone variance, edge discontinuities, corrosion hue) — not a placeholder score.

Claims & incident history
Equipment breakdown

Critical motor failure halted operations at High Street Store Marseille.

60d ago · root cause: Bearing wear beyond service interval
€41k
Equipment breakdownPREVENTED

HVAC compressor failure at High Street Store Marseille caused a partial shutdown. Caught by SafeGuard before loss occurred — figures below are the estimated avoided loss.

8 months ago · root cause: Overdue service interval
€53k
Earthquake

Seismic activity caused structural damage at High Street Store Marseille.

13 months ago · root cause: Ground motion exceeding structural tolerance
€646k
Flood

Nearby river overflow inundated the site at High Street Store Marseille.

15 months ago · root cause: Floodplain location
€386k
Flood

Nearby river overflow inundated the site at High Street Store Marseille.

22 months ago · root cause: Floodplain location
€194k